Software for faster industrial
automation deployment
Learn how CENTO helps to achieve rapid installation, cross-platform equipment integration, and quick user adoption without delays or downtime
With technology advancing at a breathtaking pace, industries can no longer afford to wait years to modernize their operations. There are moments when industrial companies face strict deadlines for automation. A plant may need to launch a digital transformation program to pass certification under standards like ISO 50001: Energy management systems or ISO 14001: Environmental management systems. In such cases, there is no time for a lengthy rollout. The system must be deployed and brought into operation without delay. That is when CENTO engineers step in. They leverage a proven approach to rapid implementation to ensure the platform is quickly installed, seamlessly connected to equipment, and ready for use within compressed timelines., helping enterprises meet compliance requirements without disrupting operations.
Faster integration through an all-in-one installation package
One of the core features that makes CENTO stand out is its single installation package. Instead of requiring multiple separate setups, everything comes bundled together: the application, the database, and even a preconfigured environment ready for immediate use. This approach eliminates the complexity of managing different components, reduces installation time, and ensures that the system is up and running with minimal effort. As a result, enterprises can move from installation to full-scale operation much faster, achieving digital transformation goals without unnecessary delays.
Why CENTO deployment is easier than traditional platforms
Deployment of CENTO requires only minimal effort from the client. The main work on their side comes down to preparing a ready-to-use server, ensuring stable network connections, and installing any missing metering devices or integration components. Once this basic infrastructure is in place, the system can immediately connect to data sources, start collecting information, and reach full operational readiness in a very short time. In most cases, no additional setup is needed for user access either. If Active Directory is in place, simply create user groups and map them to roles in CENTO. After that, employees can log in with their domain credentials, and the system will automatically recognize them and assign the correct roles, making onboarding smooth and effortless.
Seamless equipment connectivity through industrial communication protocols
Connecting CENTO to existing equipment on the client’s site is designed to be as straightforward as possible. The first production area can typically be brought online within about one week if on-site installation is required. By default, CENTO supports a wide range of industrial communication protocols, allowing seamless data exchange with meters, PLCs, controllers, and other field devices. This ensures that most equipment can be integrated without the need for custom development. In addition, the platform can be connected to existing SCADA, MES, or ERP systems in as little as a single day, depending on the configuration and available interfaces. This combination of protocol support and fast integration capabilities significantly shortens deployment timelines and makes it easier for clients to leverage their current infrastructure.
Why using XLSX and SVG imports simplifies CENTO setup
Configuration of CENTO is designed to be flexible and efficient, ensuring that projects move forward without unnecessary delays. Instead of rigid templates, the platform provides sample configurations that can be used as a starting point. Complete projects can be imported in formats like XLSX for data structures and SVG for graphic elements, making it simple to reuse and adapt screens, tags, and logic for each specific site.
The first stage of setup may fall to the client’s in-house specialists, a trusted system integrator, or CENTO’s own engineers, with the choice driven by project priorities and available resources. No matter which option is selected, the process remains smooth. When CENTO manages the work directly, the entire configuration is delivered as a complete package. If the client or integrator takes charge instead, our team maintains an active support role, offering guidance, answering questions, and resolving issues to ensure uninterrupted progress.
A major advantage that accelerates deployment is the option to set up visualization while connecting equipment at the same time. These tasks are split among different team members who work in parallel, coordinating closely to shorten the timeline and bring the system to full operation faster.
How CENTO enables fast adoption through training
Training on CENTO is designed to be straightforward and role-specific, so users can get up to speed quickly. For operators, it usually takes no more than a single working day — about 8 hours — to become confident with the interface and daily tasks. The heavier training load typically falls on those responsible for maintaining and supporting the system. For them, the process may take up to 40 hours, covering advanced functions and administrative tools.
What makes this learning curve easier is the way CENTO is built. Engineers and IT teams benefit from features like support for virtual servers, a flexible architecture, and strict security controls such as one-way data flow. Because users connect through HTTPS instead of heavy desktop clients, the environment feels lightweight and accessible. On top of that, the microservices architecture simplifies scaling and long-term maintenance.
To further smooth the process, CENTO includes built-in error checks and diagnostics. Device polling statuses, real-time logs, and clear breakdowns of calculated tags give teams visibility into the system, helping them catch mistakes early and learn through hands-on feedback. This combination of focused training and intuitive tools enables enterprises to adopt the platform swiftly while minimizing impact on staff workloads.
How to scale industrial automation without downtime or disruption
CENTO scales with ease, no matter the size of the enterprise. It has been rolled out in setups as small as 100 tags and in massive systems with more than 520,000, all while staying stable and efficient. In many cases a single server is enough, though projects can also run across several if the architecture calls for it. Some rollouts wrap up in just a month, while larger, phased implementations may take longer — but the process remains clear and manageable.
From installation to full integration: CENTO support in action
CENTO’s support philosophy is built around making deployment effortless for every client. Our team stays involved throughout the rollout, taking care of the software setup while also providing guidance on related areas such as network connections, device configuration, and system integration. This hands-on approach ensures that the platform doesn’t just get installed, it becomes fully integrated into the client’s environment from day one.
What truly sets CENTO apart is the way we approach each project. We don’t believe in one-size-fits-all solutions. Every deployment is adapted to the client’s specific processes, data sources, and integration needs. By tailoring the system around real operational workflows, we make sure it fits seamlessly with existing infrastructure while delivering immediate value and leaving room for future growth.
Clients consistently note that the speed and simplicity of setup surpass their expectations. What they often expect to be a painful process turns out to be intuitive, supported by clear guidance and a user-friendly interface. Even training, which many see as a challenge, becomes straightforward, allowing teams to gain confidence quickly and start using the system productively.